Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Dakar 2026 Youth Olympic Games open Saturday in Senegal

    October 30, 2026

    Global EV registrations hit record 11 million in nine months

    October 30, 2026

    Apple unveils MacBook Pro with OLED display and touchscreen

    October 29, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Dakar 2026 Youth Olympic Games open Saturday in Senegal
    • Global EV registrations hit record 11 million in nine months
    • Apple unveils MacBook Pro with OLED display and touchscreen
    • Integrated Identity Ranks in Top 0.1% with Flawless 100/100 Google PageSpeed
    • Oil prices rise as Brent climbs above $115 a barrel
    • Cyclone Arnab hits India’s east coast after mass evacuations
    • DR Congo Ebola cases top 10,000 in fastest-growing outbreak
    • UAE President receives flydubai crew from September incident
    Niger JournalNiger Journal
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Niger JournalNiger Journal
    Home » ADNOC, TAQA announce $3.6 billion project to decarbonise operations
    Business

    ADNOC, TAQA announce $3.6 billion project to decarbonise operations

    December 22, 2021
    Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

    Abu Dhabi National Oil Company (ADNOC) and Abu Dhabi National Energy Company (TAQA) announced a $3.6 billion (AED13.22 billion) strategic project to significantly decarbonise ADNOC’s offshore production operations, further strengthening their position in driving and leading sustainability efforts and supporting the UAE Net-Zero by 2050 Strategic Initiative.

    ADNOC, TAQA  announce $3.6 billion project to decarbonise operations

    The innovative project will see the development and operation of a first-of-its-kind high-voltage, direct current (HVDC-VSC) subsea transmission system in the Middle East and North Africa (MENA) region. It will power ADNOC’s offshore production operations with cleaner and more efficient energy, delivered through the Abu Dhabi onshore power grid, owned and operated by TAQA’s transmission and distribution companies.

    The project will be funded through a special purpose vehicle (SPV) – a dedicated company that will be jointly owned by ADNOC and TAQA (30% stake each), and a consortium comprised of Korea Electric Power Corporation (KEPCO), Japan’s Kyushu Electric Power Co. and Électricité de France (EDF). Led by KEPCO, the consortium will hold a combined 40 percent stake in the project on a build, own, operate and transfer basis.

    The consortium will develop and operate the state-of-the-art transmission system alongside ADNOC and TAQA, with the full project being returned to ADNOC after 35 years of operation. The project is subject to relevant regulatory approvals.

    The development is expected to reduce the carbon footprint of ADNOC’s offshore operations by more than 30 percent, replacing existing offshore gas turbine generators with more sustainable power sources available on the Abu Dhabi onshore power network. This progressive and collaborative approach will also drive operational efficiencies and improve system reliability of energy supply, while offering the potential for power supply cost optimisation.

    More than 50 percent of the project value will flow back into the UAE’s economy under ADNOC’s In-Country Value (ICV) program, underpinning ADNOC and TAQA’s commitment to driving responsible and sustained investment and value creation for Abu Dhabi and the UAE.

    The transmission system will have a total installed capacity of 3.2 Gigawatts (GW) and comprise two independent sub-sea HVDC links and converter stations that will connect to TAQA’s onshore electricity grid – operated by its subsidiary, Abu Dhabi Transmission and Despatch Company (TRANSCO). Construction is expected to begin in 2022 with commercial operation commencing in 2025.

    The project also offers the potential for ADNOC to more effectively utilise its rich gas – currently used to power the offshore facilities – for higher-value purposes, allowing ADNOC to generate additional revenue. A tender for this innovative project was issued in April 2020 resulting in very strong interest from international companies. Following this highly competitive tender process the consortium was selected.

    This project follows the recently announced global clean energy venture between TAQA, ADNOC and Mubadala, targeting a total generating capacity of at least 50 GW of renewable energy by 2030, and the landmark clean energy partnership with EWEC, which will see up to 100% of ADNOC’s onshore and more than 90 percent of ADNOC’s offshore production operations supplied by EWEC’s nuclear and solar clean energy sources.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

    Related Posts

    Global EV registrations hit record 11 million in nine months

    October 30, 2026

    Oil prices rise as Brent climbs above $115 a barrel

    October 29, 2026

    Microsoft offers voluntary buyouts to about 60,000 employees

    October 27, 2026
    Latest News
    Sports

    Dakar 2026 Youth Olympic Games open Saturday in Senegal

    October 30, 2026

    The Dakar 2026 Youth Olympic Games will open on Saturday, October 31, and run until November 13, marking the first Olympic sporting event ever held on African soil. The Games will bring together the world’s best young athletes, with 2,655

    Global EV registrations hit record 11 million in nine months

    October 30, 2026

    Apple unveils MacBook Pro with OLED display and touchscreen

    October 29, 2026

    Integrated Identity Ranks in Top 0.1% with Flawless 100/100 Google PageSpeed

    October 29, 2026

    Oil prices rise as Brent climbs above $115 a barrel

    October 29, 2026

    Cyclone Arnab hits India’s east coast after mass evacuations

    October 29, 2026

    DR Congo Ebola cases top 10,000 in fastest-growing outbreak

    October 28, 2026
    © 2026 Niger Journal | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.